The Ventum 3.0 turbine was successfully relocated from our headquarters to Sola on Friday, October 29th.
The location was chosen for its high exposure to wind and the prospect of leaving the turbine in place for an extended length of time.
This is real-life testing, rather than controlled testing in a wind tunnel, so the turbine will remain in Sola for at least two months. The data acquired during the testing will be utilized to specify the turbine’s output at various wind speeds and to aid in the efficiency improvement of the present design.